Genzyme Ireland HomeGenzyme Corporate HomeContact UsGenzyme Websites
Company Info
Genzyme

Corporate Info
Genzyme in Ireland
Oral Dosage Manufacturing
Technical Development
Fill / Finish Manufacturing
Expansion
Careers in Ireland
News
Global Locations

Technical Development: Oral Dose Platforms

Pilot Scale

The Oral Dosage Development Facility in Genzyme, Waterford has been in operation since March 2003. This facility serves the following key roles for Genzyme:

Production of clinical trial materials from Phase II onwards in support of Genzyme R&D pipeline.

Execution of registration batches in support of new product approvals.

Process development capability as part of new oral dosage formulation development, including manufacturing and analytical capability.

Provision of first class technical support capabilities to the full scale oral dosage manufacturing facilities in Waterford. This is achieved through use of equivalent process equipment to that utilised at full scale (1000kg) for the purposes of trouble shooting, scale up, process investigation, process optimisation.

Training/development environment for new/existing employees.

The novel and non routine nature of work to be carried out in the development facility demands that whenever possible, flexible facility design considerations have prevailed to allow for future new processes, products and ways of working.

The facility is capable of handling batch sizes up to 100kg (depending on product characteristics) for solid dose formulations. Process technologies include wetting/granulation, drying, milling, blending, compression and film coating, sachet powder blending and filling, encapsulation.

The facility is designed and operated in full compliance with safety and cGMP requirements appropriate to EU Grade D/Fed. Std. 209E Class 100,000.

Laboratory Scale

In September 2005, small scale equipment capable of handling batch sizes less than 10kg was installed. Process technologies feature wetting/granulation, milling, blending (including in line Near Infra Red) and compression. The laboratory scale facility is focussed on the Execution of experimental batches to assess formulation and process robustness of new oral dosage products.

Technical Development: Fill Finish Platforms

Technical support of Fill Finish Manufacturing operations includes;

Leading technical development and introduction of new products and processes to Waterford Fill Finish

Dealing with product related deviations / complaints / investigations

Application of Quality by Design principles to existing and intended new products

This work is supported from dedicated laboratories equipped to carry out a wide range of support activities such as;

Filtration / filling trials

Leachables and extractables

Particulates

Container closure

Lyophiliser cake evaluation



CONTACT INFORMATION:
Genzyme Ireland Ltd.
IDA Industrial Park
Old Kilmeaden Road
Waterford
Ireland

Tel: + 353 (0) 51 594100
Fax: + 353 (0) 51 594105

Directions
Email

Terms and Conditions of Use | Privacy Policy | © 2002-2010 Genzyme Ireland Ltd. All rights reserved.